These articles are the results of funded research in the area of simulation modelling.
Fozzard, G., Spragg, J., Tyler, D., Sinclair, D., and Parker, D. 1991. Handling heuristic control logic in the domain of manufacturing simulation. Proceedings of the 10th International Conference on Production Research. Pridham, M. (ed). 610-616.
Tyler, D.J. 1993, A review of applications of simulation to clothing manufacture. Journal of Clothing Technology and Management. 10(2), 11--21.
Lowe, T.J., Kalta, M., Wilson, G. and Tyler, D.J. 1994, Analysis of machine breakdown and repair for team working in the clothing industry. Journal of Clothing Technology and Management, 11(2), 1-15.
Kalta, M., Lowe, T.J., Tyler, D.J. and Wilson, G. 1994, Prototype simulation models for team working in the clothing industry. Journal of Clothing Technology and Management. 11(2), 16-30.
Tyler, D.J., Tennent, L.F., and Lowe, T.J. 1994, Simulation as a training medium for industrial supervisors. Journal of Clothing Technology and Management. 11(2), 31-44.
Leung, S.Y.S. and Tyler, D.J. 1994, Exploring the potential for computer simulation in formulating apparel sourcing strategy. Journal of Clothing Technology and Management. 11(2), 45-67.
Leung, S.Y.S. and Tyler, D.J. 1995. Buffering operator variability in the clothing factory: a simulation study. Journal of China Textile University (English Edition), 12(Supp., March), 85-94.
Lowe, T., Tyler, D., Kalta, M. and Wilson, G. 1995. Artificial Intelligence and Simulation: simulation validation for agenda based scheduling. AISB Quarterly, (Autumn, No. 93), 50-53.
Kalta, M., Lowe, T., Wilson, G. and Tyler, D. 1996. Collection and analysis of machine breakdown data for simulation of assembly teams in the clothing industry. Journal of Clothing Technology & Management, 13(1), 26-40.
Tyler, D.J. 1996. The potential for modelling manufacturing systems. Textiles go "on-line" conference Proceedings (2-3 April 1996), The Textile Institute, Manchester. 1-8.
Fozzard, G., Spragg, J. and Tyler, D. 1996. Simulation of flow lines in clothing manufacture. Part 1: model construction. International Journal of Clothing Science and Technology. 8(4), 17-27.
Fozzard, G., Spragg, J. and Tyler, D. 1996. Simulation of flow lines in clothing manufacture. Part 2: credibility issues and experimentation. International Journal of Clothing Science and Technology. 8(5), 42-50.
Kalta, M., Tyler, D., Lowe, T. and Wilson, G. 1997. COATS: simulation of dynamic team behaviour in the clothing industry. In: Tyler, D.J. and Totterdill, P. (eds), Restructuring Manufacturing, The Textile Institute, Manchester. 75-91.
Spragg, J.E., Fozzard, G., and Tyler, D.J. 1997. Constraint based reactive rescheduling in a stochastic environment. In: Steel, S and Alami, R. (eds), Recent Advances in AI Planning, 4th European Conference on Planning, ECP'97 Toulouse, France, September 1997 Proceedings. Lecture Notes in Artificial Intelligence 1348, Springer, 403-413.
Kalta, M. Lowe, T. and Tyler, D. 1997. A decision support system for designing assembly cells in Apparel Industry. In: Suresh, N.C. and Kay, J.M., (Eds.), Group Technology and Cellular Manufacturing: A state-of-the-art synthesis of research and practice, Kluwer Academic Publishers, Boston.
Tyler, D.J. 2003. Computer simulation of manufacturing systems. Part 1: How can simulation help solve real world problems? StitchWorld, 1(2), 13-14.
Tyler, D.J. 2003. Computer simulation of manufacturing systems. Part 2: simulation applied to more complex systems. StitchWorld, 1(8), 9-13.
Al-Zubaidi, H. and Tyler, D. 2004, A simulation model of quick response replenishment of seasonal clothing, International Journal of Retail & Distribution Management, 2004, 32(6), 320-327.